Daily Log Journal

Date TIJ1O1-04 Daily Entry Points
02-02-18 U1A1 Timetable, survey, web site resource, about Mr. F, course outline HO-sig. req, and tech info HO-fill in, due Mon
02-05-18 Foreperson, room 166 layout rev, safety PPT, safety contract HO- sig req., safety passport HO-sig req
02-06-18 Assembly schedule, Spice design process, 2 safety posters, thumbnails, technical sketching, layout, poster ideas , PT
02-07-18 Late start, Online mark reporting and process, Rev poster Req, thumbnails due,  PT  and Space X video 
02-08-18 Safety poster final design, PT
02-09-18 Safety poster final design due PT
02-12-18 Dailly Journal format and check (JC) overview, Gothic font format practice for Duo-tang ID,  PT, JC
02-13-18 Duo-tang lettering process and papers insert, PT, JC
02-14-18 Late start, Journal check continue and Duo-tang finish, PT
02-15-18 Computer accounts - drop-off and pick-up folders, saving work, shortcuts project, PT, JC
02-16-18 PA Day - No Classes
02-19-18 No - Classes (Family day)
02-20-18 Shortcuts Rev, shortcuts txt project, Duo-tang due, PT, JC
02-21-18 Late start, PT- Shortcuts text project work time, journals
02-22-18 Recap on shortcuts text file and Duo-tang req. careers project intro - career select & rough doc, PT, JC
02-23-18 Careers -  Steps to take, check point responsiblities & dates, topic details, PT, JC 
02-26-18 Faulty Towers (FT) intro, radar beacon CAL. school vs tower walk, measure, CAL., careers research reminder, PT, JC
02-27-18 PT to work on school vs tower & radar beacon CAL., careers research if time
02-28-18 Late start, Recap on FT calculations - due, PT, JC
03-01-18  Mark feedback for >60%,early warning letter, Tup FT calculations, FT samples, ideas, thumbnail layout, PT, JC
03-02-18 FB on FT calculations and peer eval, PT on thumbnails, JC
03-05-18 Career info roughs due in drop-off, PPT Sketch layout, 5 thumbnails due Tue, PT, JC
03-06-18 SPICE for FT, Radar beacon design, PT, JC
03-07-18 Late start,  PT on finishing pass due FT assignments, career ppt layout slide in application, fill in journal
03-08-18 PPT layout page template due, start on PPT slides, FT final tower and beacon design sketch, PT, JC
03-09-18 PT FT materials packed, FT work due, PT, JC
03-19-18 FT build process, prototyping, partners, bulid materials orgainzation, PT, JC
03-20-18 PT for FT Build with partner (60 min), JC
03-21-18 Late start, FT De-brief-wrap-up, PT on  PPT presentations finish (due), JC
03-22-18 Intro to Logo project - HO, Graphic Communications (GC) Rev HO, PT, JC
03-23-18 Illustrator intro- layout and key steps, finish GC Rev, PT, JC
03-26-18 GC Tup, Illustrator demo, PT, JC
03-27-18 FB on GC, Career presentation order, PT on Illustrator, JC
03-28-18 Late start, PT on vector basics and start on colour, JC
03-29-18 2 small videos on presentations, cont with vector colour, JC
03-30-18 No - Classes (Good Friday)
04-02-18 No - Classes (Easter Monday)
04-03-18 Parent Interview Schedule, Logo Thumbnails, PT, JC
04-04-18 Late start,  Final Logo  idea - Colour & Black/white sketch design, PT, JC
04-05-18 Grd 9 student success day activities, catch-up on work invitation
04-06-18 Logo Display uisng Illustrator, PT, JC
04-09-18 Career PPT's *2, Header/footer Apps - logo design placement, PT, JC
04-10-18 OSSLT Testing, no classes today
04-11-18 Late start,  Career PPT *1, PT, JC
04-12-18 Career PPT's *1, header demo on Word/Excel, PT, JC
04-13-18 Career PPT's *2, header-footer demo on PPt , PT, JC
04-16-18  PT for logo header project, JC
04-17-18  PT for logo header project, JC
04-18-18 Late start,  header-footer demo on Dreamweaver , PT, JC
04-19-18 Career PPT (1), PT web page logo report using Dreamweaver, JC
04-20-18 Mid Term Marks submitted, Intro to Project box, PT on logo project, JC
04-23-18 Shop 165 layout/tour, Project box HO and review, key terms to fill in, PT, JC  (20*23" corrugated cardboard req for Mon)
04-24-18 Safety - knife and ladder, Review questions, Project box pattern trace steps, PT, JC
04-25-18 Late start, Safety quiz - sharp tools/ladder,  PT, JC
04-26-18 Project box marketing design sketch, #3 and  4 rev questions PT, JC
04-27-18 Project box design theme locations and finish (due), #5 and 6 rev questions, PT, JC
04-30-18 Project box design theme FB, Rev questions due, PT, JC
05-01-18 Peer Tup Rev questions, PT for box build/marketing images, JC
05-02-18 Late start, Rev project box requirements, PT for project box build/marketing images, JC
05-03-18 PT for project box build/marketing, JC
05-04-18 Check list for project box, SPICE for inside box lid, PT for project box build/marketing, JC
05-07-18 Key Holder (KH) project HO, Review questions, and new terms
05-08-18 Intro to KH project, thumbnails, review questions due, PT, JC
05-09-18 Late start, PT on thumbnails, JC
05-10-18 Tup KH rev questions, Ortho sketch of final design, PT, JC
05-11-18 Mark update, FB on Thumbnails, PT on ortho of final KH design, PT, JC
05-14-18 Oblique final design, PT on ortho, JC
05-15-18 Miter saw parts, operation, safety, and demo, shop safety details, measurement and layout with square, PT, JC
05-16-18 Late start,  Drill press parts, operation, safety, and demo, PT, JC
05-17-18 PT for miter and drill practice, finish oblique full scale final sketch design, JC
05-18-18 Bandsaw parts, operation, safety, and demo, PT, JC
05-21-18 No - Classes (Victoria Day)
05-22-18 Spindle, disk, and flat sander parts, operation, safety, and demo, PT, JC
05-23-18 Late start, Rev carbon pattern transfer, PT, JC
05-24-18 Hand tools and paint process intro, (bandsaw demo again for three)PT, JC
05-25-18 PT, JC
05-28-18 Intro to Co2 Dragster (Culminating Project - Due June 15th) - research - sign-up, PT
05-29-18 Dragster research details, final sign-up, PT
05-30-18 Late start,  Finish research - due, PT
05-31-18 FB on reseach - in pick-up folder, dragster thumbnails (5 ideas), PT
06-01-18 Dragster Rev Specs, ortho, PT
06-04-18 Dragster ortho due, final design-full scale, PT
06-05-18 Ortho FB, final dragster design due, PT
06-06-18 Late start, Prototype build, PT
06-07-18 Prototype build, refinement, PT
06-08-18 Weekly Jjournal summary, Dragster build, PT
06-11-18 PT on dragster build
06-12-18 PT on dragster build - finish
06-13-18 Late start, PT on dragster finish
06-14-18 PT on dragster finish and hardware install
06-15-18 Culminating Due  - Dragster, Report, and Summary Journal (started May 28th)
06-18-18 Dragster competition race times, term work finish up, PT 
06-19-18 Dragster competition heats for clas first place, class wrap-up, last regular class day, academic exams to follow 
06-20-18 No official class, Mr.F 10:30 to 3:30 in 166/65 open for students to finish work if needed
06-27-18 Exam return day and Commencement