Course Daily Journal

Date TIJ1O1-01 Daily Entry Points
09-04-18 Short morining schedule: Course outline HO Rev & sig. req, timetable check, agenda/school general info review
09-05-18 Late start, HF Lockers assigned, survey filled out due 06
09-06-18 Lockers finish, Tech Info HO-course FB & peer partners, seating plan, tour, web site-details, journal, marks, about Mr. F
09-07-18 Evaluation, marks, learning skills, foreperson, safety ppt, Gen Safety HO to sign
09-10-18 166 Room layout HO and fill in, 165 shop tour for safety posters, tech tour continue
09-11-18 Safety poster sketch - layout, thumbnails ideas demo, and practice
09-12-18 Late start, Finish 6 thumbnails, start 2 final mini safety poster designs
09-13-18 Thumbnails due, rev safety poster process and expectations, finish off 2 final designs for mini poster
09-14-18 Safety posters due, Gothic font lettering practice
09-17-18 Grade 9 Camp Retreat
09-18-18 Grade 9 Camp Retreat
09-19-18 Late start, FB on gothic font practice, intro to journals and duo-tang supplied and kept in class, duo tang/journal ID
09-20-18 Computer log-on, use chairs, journal entries intro, samples, tips and practice, PT for duo-tang, JC
09-21-18 Shortcuts - folder and web on USB, H drive, & Desktop creation, PT, JC 
09-24-18 Journal sheets HO, Duotangs past due, shortcuts assign - shortcut addresses, sample, PT, JC
09-25-18 Career selection intro and sign-up after finishing shortcuts assign, PT, Journal entry
09-26-18 Late start, Assembly on student passing away, Career research process, PT shortcuts, duotang ID
09-27-18 Career project timelines, PT shortcuts, duotang ID, career research, JC
09-28-18 PT for duotang, shortcuts, career research
10-01-18 FB on journals & shortcuts, career research steps grade 10 subject info, PT, JC
10-02-18 PPT sketch layout *2 lesson/assigned to finish in class, PT career research, JC
10-03-18 Late start, Faulty Towers (FT) intro, materials, PT, JC
10-04-18 Reminder (rough career notes due Tue) FT SPICE design porcess, radar beacon range calculation, PT, JC
10-05-18 PA Day - No Classes
10-08-18 Thanksgiving - No Classes
10-09-18 Career notes due,Tup radar beacon range calculation, ideas on tower build, 5 thumbnail sketched ideas, PT, JC
10-10-18 Late start, FB on FT cal., FB on Career digital rough notes, past due work, Career PPT template, PT, JC
10-11-18 PPT template demo, FT 5 sketch ideas -sketch techniques, layout, joints, materials, labels, beacon Demo, PT, JC
10-12-18 PPT template due, PT for FT 5 sketch ideas, JC
10-15-18 Tower vs school size exercise - walk length/measure demo sample calculations, PT, JC
10-16-18 Short morining schedule: Parent interviews afternoon evening, Tower vs school calculations, PT, JC
10-17-18 Late start, Final tower and beacon design sketch (full page), beacon pattern, PT, JC
10-18-18 Tup Tower vs school calculations, FT design, build, final construction,  Materials prepared, PT for FT final design, JC
10-19-18 Career ppt due, FT Competition build 45 min, test and measure, JC
10-22-18 Graphic Logo (GL) intro, HO, key terms, Illustrator intro, PT, JC
10-23-18 Grade 9 Student Success Day - Regular period fo catch-up with past work
10-24-18 Late start, Career presentation order (talking points due), MS Excel - fill in key terms already done, PT, JC
10-25-18 Vector drawing basics (VDB) demo - setup, preferences, guides, layers, text tool, shapes tools, PT, JC
10-26-18 Student PPT *2, VDB rev, PT, JC
10-29-18 Student PPT *2 - none ready, rev VDB steps, PT, JC
10-30-18 Student PPT *2, PT for VDB, JC
10-31-18 Late start,  Student PPT *1, PT for VDB, JC
11-01-18 Student PPT *2, Vector drawing colour(VDC) - change 4 features of each object demo, PT, JC
11-02-18 Student PPT *2, PT for VDC, JC (Career PPT's finished)
11-05-18 Principles and Elements of Design HO, Elements of design video -fill in HO, PT, JC  
11-06-18 Principles and Elements of Design HO, Principles of design video -fill in HO, PT, JC  
11-07-18 Late start, GL HO, page 8 - cut & paste examples of Principles and Elements of design, PT, JC (Term 2 Begins)
11-08-18 Rev Logo requirements, Sketching demo - layout for 5 ideas, sample, PT, JC
11-09-18 Logo design resources, final Logo sketch design, PT, JC
11-12-18 Final logo creation in Illustrator, PT, JC
11-13-18 Short schedule (Grade 8 Parents evening), Header sketch designs, PT for logo creation in Illustrator
11-14-18 Late start, ( also take your kid to work day), Export image, MS Word header/footer demo, PT, JC
11-15-18 Rev export image and MS Word header/footer, Demo with Excel header/footer, PT, JC
11-16-18 PA Day - No Classes
11-19-18 PowerPoint header/footer demo, PT, JC
11-20-18 Dreamweaver intro, STE file set-up with final report template, PT, JC
11-21-18 Late start, Rev report req -samples, cardboard 23*20 inches req, PT to finish header/footers and final web report, JC
11-22-18 U2A2 Project Box (PB) HO, PT first for Rev HO, fill in key terms, then web report, JC
11-23-18 Rev PB HO, PB Rev Quest HO, PT first for Rev HO, answer quest 1-4, then web report, JC
11-26-18 PT for GL web report, JC
11-27-18 Sharp tools Rev, shop room layout HO and fill in with tour, PB Rev questions 5-6 (expectations on 6), PT, JC
11-28-18 Late start, Demo on box pattern build, utility knife (safety) demo, sketch of 6 sides of box ideas, PT, JC
11-29-18 Tup PB Rev, Sharp tools/ladder safety quiz, PT, JC
11-30-18 FB on safety quiz, SPICE colour cartoon story for inside box lid, PT, JC
12-03-18 PT on pattern transfer to cardboard, bends/cuts identified, cut out, safety quiz re-take, JC
12-04-18 Continue creating box, class bar, logo, name, cut out magazine images related to themes, JC
12-05-18 Late start, Rev PB build, box ID and decoration of themes, checklist and report, JC
12-06-18 Intro to Key Holder (KH) project HO - Rev Quest HO, PT to finish project box, JC, 10 to 2:45 Lockdown
12-07-18 PA Day - No Classes
12-10-18 KH Rev Quest due, KH requirements, 5 thumbnails, PT, JC
12-11-18 Tup Rev Quest, 5 thumbnails due, final idea with ortho and dim rev, exemplar reviewed, PT, JC
12-12-18 Late start, Ortho with dim due, PT to start on oblique on graph paper - full scale final design, JC
12-13-18 Oblique colour Rev, mitre saw safety -parts, operation, rules, demo, layout, PT student cut demo, JC
12-14-18 Drill press safety -parts, operation, rules, demo, layout, PT student drill demo, JC
12-17-18 Bandsaws and sander safety -parts, operation, rule, layout sketch, PT, JC
12-18-18 Bandsaw, sander demos, layout, PT student bandsaw and sander demos, JC
12-19-18 Late start, PT for practice piece, JC
12-20-18 Overview of culminating, Rev KH oblique pattern to wood process, PT for KH build, JC
12-21-18 Free period to work on any termwork, voted movie in background to watch 
01-07-19 Start culminating - Co2 dragster intro, rev HO, samples, timeline, key terms, research topic, PT
01-08-19 Finish researched topic, start co2 dragster thumbnails
01-09-19 Late start, Researhed topic trades, finish co2 dragster thumbnails
01-10-19 Co2 dragster design selected - full page ortho create
01-11-19 Co2 dragster 1:1full scale pattern front and top view - TSA Specs
01-14-19 Co2 dragster pattern approval (TSA Specs) and create prototype
01-15-19 Co2 dragster basswood cut-out and shaping
01-16-19 Late start, Dragster cut-out and sanding
01-17-19 Continue with Dragster sanding/finishing
01-18-19 Dragster finishing, gather report material and complete
01-21-19 Culminating due - Dragster, report and 14 weekly journals summarized
01-22-19 Course wrap-up, Co2 Dragster races, last day of classes - Final mark is posted
01-23-19 Late start, Exams
01-24-19 Exams
01-25-19 Exams
01-28-19 Exams
01-29-19 Exams
01-30-19 Late start, Exam Return Day, feedback on culminating, pass out green timetables for next semester
01-31-19 PA Day - No Classes