Date |
TIJ1O1-05 Daily Entry
Points |
02-02-18 |
U1A1 Timetable, survey, web site resource, about Mr. F,
course outline HO-sig. req, and tech info HO-fill in, due Mon |
02-05-18 |
Foreperson, room 166 layout rev, safety PPT, safety
contract HO- sig req., safety passport HO-sig req |
02-06-18 |
Assembly schedule, Spice design process, 2 safety posters, thumbnails,
technical sketching, layout, poster ideas , PT |
02-07-18 |
Late start, Online mark reporting and process, Rev poster Req,
thumbnails due, PT and Space X video |
02-08-18 |
Safety poster final design, PT |
02-09-18 |
Safety poster final design due, PT |
02-12-18 |
Dailly Journal format and check (JC) overview, Gothic
font format practice for Duo-tang ID,
PT |
02-13-18 |
Duo-tang lettering process and papers insert, PT, JC |
02-14-18 |
Late start, Journal check continue and Duo-tang finish, PT |
02-15-18 |
Computer accounts - drop-off and pick-up folders, saving
work, folders and shortcuts, PT, JC |
02-16-18 |
PA Day - No Classes |
02-19-18 |
No - Classes (Family day) |
02-20-18 |
Shortcuts Rev, shortcuts txt project, Duo-tang due, PT,
JC |
02-21-18 |
Late start, PT- Shortcuts text project work time, journals |
02-22-18 |
Recap on shortcuts text file and Duo-tang req. careers
project intro - career select & rough doc, PT, JC |
02-23-18 |
Careers - Steps to
take, check point responsiblities & dates, topic details, PT, JC |
02-26-18 |
Faulty Towers (FT) intro, radar beacon CAL. school vs
tower walk, measure, CAL., careers research reminder, PT, JC |
02-27-18 |
PT to work on school vs tower & radar beacon CAL.,
careers research if time |
02-28-18 |
Late start, Recap on FT calculations - due, PT, JC |
03-01-18 |
Mark feedback for
>60%,early warning letter, Tup FT calculations, FT samples, ideas,
thumbnail layout, PT, JC |
03-02-18 |
FB on FT calculations and peer eval, PT on thumbnails, JC |
03-05-18 |
Career info roughs due in drop-off, PPT Sketch layout, 5
thumbnails due Tue, PT, JC |
03-06-18 |
SPICE for FT, Radar beacon design, PT, JC |
03-07-18 |
Late start, PT on finishing
pass due FT assignments, career ppt layout slide in application, fill in
journal |
03-08-18 |
PPT layout page template due, start on PPT slides, FT
final tower and beacon design sketch, PT, JC |
03-09-18 |
PT FT materials packed, FT work due, PT, JC |
03-19-18 |
FT build process, prototyping, partners, bulid materials
orgainzation, PT, JC |
03-20-18 |
PT for FT Build with partner (60 min), JC |
03-21-18 |
Late start, Late start, FT De-brief-wrap-up, PT on PPT presentations finish (due), JC |
03-22-18 |
Intro to Logo project - HO, Graphic Communications (GC)
Rev HO, PT, JC |
03-23-18 |
Illustrator intro- layout and key steps, finish GC Rev,
PT, JC |
03-26-18 |
GC Tup, Illustrator demo, PT, JC |
03-27-18 |
FB on GC, Career presentation order, PT on Illustrator,
JC |
03-28-18 |
Late start, PT on vector basics and start on colour, JC |
03-29-18 |
2 small videos on presentations, cont with vector colour,
JC |
03-30-18 |
No - Classes (Good Friday) |
04-02-18 |
No - Classes (Easter Monday) |
04-03-18 |
Parent Interview Schedule, Logo Thumbnails, PT, JC |
04-04-18 |
Late start, Final Logo idea -
Colour & Black/white sketch design, PT, JC |
04-05-18 |
Grd 9 student success day activities, catch-up on work
invitation |
04-06-18 |
Logo Display uisng Illustrator, PT, JC |
04-09-18 |
Career PPT's *2, Header/footer Apps - logo design
placement, PT, JC |
04-10-18 |
OSSLT Testing, no classes today |
04-11-18 |
Late start, Career PPT *1,
PT, JC |
04-12-18 |
Career PPT's *2, header demo on Word/Excel, PT, JC |
04-13-18 |
Career PPT's *2, header-footer demo on PPt , PT, JC |
04-16-18 |
PT for logo header
project, JC |
04-17-18 |
PT for logo header
project, JC |
04-18-18 |
Late start, header-footer
demo on Dreamweaver , PT, JC |
04-19-18 |
Career PPT (1), PT web page logo report using
Dreamweaver, JC |
04-20-18 |
Mid Term Marks submitted, Intro to Project box, PT on
logo project, JC (20*23"
corrugated cardboard req for Mon) |
04-23-18 |
Shop 165 layout/tour, Project box HO and review, key
terms to fill in, PT, JC |
04-24-18 |
Safety - knife and ladder, 2 Review questions, Project
box pattern trace steps, PT, JC |
04-25-18 |
Late start, Safety quiz -
sharp tools/ladder, PT, JC |
04-26-18 |
Project box marketing design sketch, #3 and 4 rev questions PT, JC |
04-27-18 |
Project box design theme locations and finish (due), #5
and 6 rev questions, PT, JC |
04-30-18 |
Project box design theme FB, Rev questions due, PT, JC |
05-01-18 |
Peer Tup Rev questions, PT for box bulid/marketing
images, JC |
05-02-18 |
Late start, Rev project box requirements, PT for project box
build/marketing images, JC |
05-03-18 |
PT for project box build/marketing, JC |
05-04-18 |
Check list for project box, SPICE for inside box lid, PT
for project box build/marketing, JC |
05-07-18 |
Key Holder (KH) project HO, Review questions, and new
terms |
05-08-18 |
Intro to KH project, thumbnails, review questions due,
PT, JC |
05-09-18 |
Late start, PT on thumbnails, JC |
05-10-18 |
Tup KH rev questions, Ortho sketch of final design, PT,
JC |
05-11-18 |
Mark update, FB on Thumbnails, PT on ortho of final KH
design, PT, JC |
05-14-18 |
Oblique final design, PT on ortho, JC |
05-15-18 |
Miter saw parts, operation, safety, and demo, shop safety
details, measurement and layout with square, PT, JC |
05-16-18 |
Late start, Drill press
parts, operation, safety, and demo, PT, JC |
05-17-18 |
PT for miter and drill practice, finish oblique full
scale final sketch design, JC |
05-18-18 |
Bandsaw parts, operation, safety, and demo, PT, JC |
05-21-18 |
No - Classes (Victoria Day) |
05-22-18 |
Spindle, disk, and flat sander parts, operation, safety,
and demo, PT, JC |
05-23-18 |
Late start, Rev carbon pattern transfer, PT, JC |
05-24-18 |
Hand tools and paint process intro, (Sanders demo again
for those that missed it again) PT, JC |
05-25-18 |
PT, JC |
05-28-18 |
Intro to Co2 Dragster (Culminating Project - Due June
15th) - research - sign-up, PT |
05-29-18 |
Dragster research details, final sign-up, PT |
05-30-18 |
Late start, Finish research - due, PT |
05-31-18 |
FB on reseach - in pick-up folder, dragster thumbnails (5
ideas), PT |
06-01-18 |
Dragster Rev Specs, ortho, PT |
06-04-18 |
Dragster ortho due, final design-full scale, PT |
06-05-18 |
Ortho FB, final dragster design due, PT |
06-06-18 |
Late start, Social Safety assembly presentation |
06-07-18 |
Prototype build, refinement, PT |
06-08-18 |
Weekly Journal summary, Dragster build, PT |
06-11-18 |
PT on dragster build |
06-12-18 |
PT on dragster build - finish |
06-13-18 |
Late start, PT on dragster finish |
06-14-18 |
PT on dragster finish and hardware install |
06-15-18 |
Culminating Due -
Dragster, Report, and Summary Journal (started May 28th) |
06-18-18 |
Dragster competition race times, term work finish up,
PT |
06-19-18 |
Dragster competition heats for clas first place, class
wrap-up, last regular class day, academic exams to follow |
06-20-18 |
No official class, Mr.F 10:30 to 3:30 in 166/65 open for
students to finish work if needed |
06-27-18 |
Exam return day and Commencement |
|
|